The town hall has invested more than € 16,000 to make this sports facility that is usually used by hundreds of folding machines now more comfortable and modern.
The mayor of Pliego, Antonio Huéscar, said that these actions have improved the quality of our field for the enjoyment of our athletes.
The City of Pliego has carried out numerous actions to improve the state of the football field with an investment that has exceeded € 16,000.
In this way, the demand for the improvement of both the changing rooms and their plumbing, as well as the artificial turf, the accessibility of the enclosure and the lighting has been met.
The changing room area has undergone major changes, as the ceilings have been fixed and the showers have been modified.
In addition, heating has been installed, showers have been incorporated to promote mixed equipment in sporting events, the exterior pavement and leaks have been fixed, all electrical damage has been repaired and the necessary adaptation of toilets for people with reduced mobility.
Improvements have also been made on the pitch, since all holes in the artificial turf that have existed for more than two years have been fixed, as well as the water pump that has also been fixed, in addition to being installed a new tower of spotlights that will allow a better light for training and nighttime games.
For the mayor of Pliego and his government team, with these improvements "the athletes of our town gain in comfort and modernize facilities that always have a high influx of public."
Source: Ayuntamiento de Pliego