Portal de Pliego

www.portaldepliego.com

Pliego - SpanishPliego - English
detail of Pliego

 

The works to adapt the Cemetery Path have been completed (13/03/2018)

Steps have also been taken to the downhill lane without having to reach the cemetery with an opening between the pedestrian area of ​​the boulevard

The Municipality of Pliego reports that they have completed the remodeling of San Isidro Labrador Street, better known as the cemetery road, one of the projects included in the Works and Services Plan and which was a demand much sought after by many residents of Pliego, being specially requested in the Participatory Budgeting process last January.

With the completion of this investment, the roadway has been repaired, which was very deteriorated due to the roots of the adjacent trees, and technical improvements have been made to the fundamental services and traffic functionality.

On the one hand, it has taken advantage of the arrangement of this street to change the deteriorated supply of water supply, which in that area was giving quite a lot of problems in recent times with the repetition of breakages and has been replaced by a new one with more modern materials and durable.

On the other hand, two new spaces have been opened for the passage of vehicles between the pedestrian boulevards of the cement road that have improved the traffic flow that goes to the funeral homes, since the vehicles that want to go to the downhill lane In order to return to the urban center, they no longer have to go up to the cemetery's surroundings, as it was the case until now.

Source: Ayuntamiento de Pliego

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información