Portal de Pliego

www.portaldepliego.com

Pliego - SpanishPliego - English
detail of Pliego

 

1.2 million for the construction of a storm tank and a collector for collecting wastewater in Pliego (12/12/2014)

The Governing Council has given the green light to works for the construction of a storm tank and a drain in Pliego, for which an investment of 1.2 million euros will be made, financed 80 percent by the Cohesion Fund of the European Union, and the rest by own funds of the Community.

This infrastructure will enable troubleshoot surface water pollution, for washing streets and collectors, the first delluvia volumes caídaen the urban municipality is producencon and discharging to a suitable channel públicosin treatment.

The evacuation collector, not separative, wastewater will pass through the town of Pliego, a length of 778 meters.

The waters of this collector will be conducted to the new tank storms, which have a capacity of 1,380 cubic meters, which will be stored washing water to then be treated in the treatment plant.

Excess water collection, and no pollution, will be relieved to bed.

These actions are included in the General Plan of cleansing and purifying of the Region of Murcia, which has allowed 99 percent of the regional population has access to this service, and recover all of the water, with over one hundred hectómetros cubic.

Source: CARM

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información